Australias Largest Manufacturer and Suppliers of Insulated Concrete Forms
  Home Abuout Us Builders/Developers Owner Builder Architects/Building Design Engineers-Geotech/Structural Contact Us Website Builder
 
User Login

   
 
 
 
   Forgot Your Password?

   No account yet? Register

User Menu

 
Formulae
ZEGO Store

FAQ

Frequently Asked Questions.
Search This FAQ

There are 16 entries in the FAQ.
Pages: 1

Questions:

How is the base of a swimming pool created
Is Zego suitable for loadbearing walls
Can metal cladding be fixed with battens on the 150 series? if so does the Zego block need to be sealed?
If using ZEGO as a retaining wall, can tiles be fitted directly to product without rendering first.
what about impact resistance with the render layer over the polystyrene ?
How can you create recesses on internal walls for display objects & uplights?
How do you easily hang a picture on an internal wall
Does ZEGO give off toxic fumes during a fire
Which ZEGO ICF Series should I use?
What does it cost?
How do you install architraves and skirtings boards?
What are the benefits of ZEGO?
Formwork to Window and Door Openings?
How do you install windows and door frames?
How do you install overhead cupboards?
Top Plate?

Questions and Answers
How is the base of a swimming pool created
The base is formed as a slab, install hydrostatic valve and pipework, place reinforcement as per engineering drawings ( you can download pool engineering drawings by registering and logging back in ) Place starter bars to the perimeterand then pour the slab with or with slope it's your choice.
Is Zego suitable for loadbearing walls
The reinforced concrete core is the load bearing wall and the ZEGO is simply stay in place formwork for casting the concrete to the engineers specification for your structure.
Can metal cladding be fixed with battens on the 150 series? if so does the Zego block need to be sealed?
Yes, batten the wall then fix the metal cladding. Seal the bottom of the wall with a metal capping and install an approved termite barrier.
If using ZEGO as a retaining wall, can tiles be fitted directly to product without rendering first.
Make sure first that you have good drainage behind the wall. Yes you then simply apply your prefered acrylic tile adhesive, then lay your tiles, grout up your joints and clean up.
what about impact resistance with the render layer over the polystyrene ?
Reinforced Acrylic Render ( with or without texture) is the most commonly used finish and will provide an impact resistance surface able to resist all normal treatment associated with domestic and commercial constructions. Installation Firstly, brush down the surface to remove any debris Trowel on 4mm of base coat acrylic render (render to comply with CA26 Compliance) Roll out the reinforcement mesh for the render and trowel onto the surface Do not staple the mesh to the wall Overlap the slabs edge by 50mm minimum Cut 45 deg from the corner of the window openings Measure the reveal back to the windows, then measure, cut the mesh and fold back onto the reveals Ensure you reinforce the corners with additional reinforcement mesh Trowel on another 4mm of base coat On completion, an 8mm base coat with reinforcement mesh in the centre for impact resistance
How can you create recesses on internal walls for display objects & uplights?
Yes and this is simple to do. Here are a couple of examples. - Prior to plasterboarding the walls simply remove the foam surface and this will make a recess. Plaster the recess and you have a nice niche for artwork, photo frames etc. - If you require a deeper niche, simply place formwork to form the niche prior to concreting - If you require downlights or uplights to the opening you again form out for these
How do you easily hang a picture on an internal wall
Use the normal picture hook ( these have a hole at 45deg) and nail into the plasterboard. The plasterboard will take the weight of pictures and wall hangings up to 10-15kg. For heavier items simply mount back to the concrete core.
Does ZEGO give off toxic fumes during a fire
Comments: At 600 Deg C ZEGO F grade flame retardant EPS will begin to melt. ZEGO Is made of 98% air and there is less Parts Per Million PPM than that of hardwood when burnt. As with burning timber toxic fumes are given off. ZEGO Complies with all building codes in Australia and World Wide and unlike timber ZEGO's uses self extinguishing F grade EPS Flame Retardant foam
Which ZEGO ICF Series should I use?
150 Series: For up to two storeys with Timber first floor only. For areas with wind load of 41mps or less.

200 Series: Up to three levels above grade with concrete suspended slabs between levels.

250 Series: Ideal for below grade retaining walls and multiple level construction. Pool, watertanks, and civil works pits etc.

Fire Form: Available in a choice of insulating thickness and core width. As the name suggests, a fully certified fire rated form system for party walls, boundary walls and fire seperation spandrals.

ReFORM: A fully strippable and reuseable formwork system for basement carparks, watertanks, swimming pools and for clients who require an external solid concrete surface to the outside of their building. ReFORM can be used in conjuction with ZEGO Fire Form insulating panels which provide not only insualtion but a service duct area for the plumbing and electrical/data services to run in without structual damage to the concrete core.

What does it cost?
A builder can build the external walls of your home in ZEGO for the same cost as a brick veneer home!

However, benefits of ZEGO vs Brick:

 

  • A ZEGO Home will save you 50% to 80% of your annual heating and cooling costs. Thereby, reducing the greenhouse emissions from the powerstations as they don't have to produce as much power for ZEGO home owners.
  • ZEGO Homes are 6 to 9 times stronger than a traditional home due to the reinforced concrete core.
  • Cyclone rating is easily achieved.
  • Speed of construction is 1 to 1.5 weeks faster per floor level.
  • Less labour to be organized.
  • Easy clean up.
  • Simple installation of ducted vacuum, plumbing and electrical / Data Services without structural damage.
  • Quieter and more peaceful to live in.
  • Greater resale value as energy effeicent homes become more popular.

 

 Click here for ZEGO cost comparison

How do you install architraves and skirtings boards?
These are simply installed 1-Applying NO More Nails, Max Bond or ZEGO's adhesive foam spray to the back of the board. 2-After positioning shoot "T" nails at 45deg into the board and through the plasterboard. 3-If there is a bow in the board simply place a spreader from one side of the room to the board to hold in place untill the adhesive has cured. 4-This will hold the board in place untill the adhesive has cured. 5-The other side of the architraves that are mounted on the windows timber reveal can be nailed as normal.
What are the benefits of ZEGO?
  • Service and Professionalism.
  • Male and Female Diamond interlock eliminates slippage during construction and during the concrete pour.
  • Patented Dovetailed Grooves for render and plasterboard support.
  • 300mm high coursing to suit door, window and ceiling heights 2100mm - 2400mm - 2700mm - 3000mm etc.
  • 50mm interlock and intersect.
  • Closed end and open end forms.
  • Patented Wall Brace Scaffolding System.
  • Save 50% to 80% of heating and cooling costs year after year.
  • Significantly save on material handling and labour onsite.
  • Replaces Brickwork and the frame in one process.
Formwork to Window and Door Openings?
The following options and variations are available to you;

  1. 18mm plywood stripped to width of ZEGO wall form ie 200 Series forms are 190mm wide
  2. Cut a 100 x 50 timber the width of the opening and nail or screw the plywood to the 100mm face
  3. Cut some extra plywood 300mm x 190mm for base plates that sit on the window sill (NOTE: Not needed for door openings or full height windows)
  4. Now cut precisely 100 x 50mm Props between the top of the baseplate and the underside of the 100 x 50 at the head (NOTE: If these props are too long, they will open up the course line of the forms)
  5. If more than 300mm lintel height, foam up both sides of the head form
Options

  1. Use wide timbers eg planks cut to length for head timber
  2. Follow item 3 to 5 above
Options (Ideal for the contractor with multiple projects)

  1. Folded sheet metal cut to length or telescopic 1.2mm thickness
  2. Follow item 3 to 5 above
How do you install windows and door frames?
Firstly, it does not make sense to build an energy efficient building, then remove the foam insulation on the reveals when installing window and door frames!

Installation of Window and Door Frames

  1. The opening should be approximately 10mm larger around all the window or door frames
  2. Leave the foam in place and foam in using ZEGO window and door foam
  3. Wedge the frame square and plumb in the opening
  4. Make sure that any reveals are 15mm inside the room. This is to allow for the 10mm plasterboard and the 5mm air gap where the cornice cement is
  5. With slidding windows and doors open the slidder a little so that you can rack the frame to have the slidder and frame meet parrallel
  6. Now tack the frame in place in the corners and at 600mm maximum centres using ZEGO window and door foam (Dries in approx one hour)
  7. Proceed with installation of other frames in the building for approx one hour
  8. Return to the first frame, check it is still square, in wind and plumb
  9. If all OK, remove the wedges
  10. Starting at the top of the window frame, spray ZEGO window and door foam in a continuous motion around the entire perimeter of the frame
  11. Allow to dry and proceed with the other frames in the building for approx one hour
  12. Repeat the full seal around the outside of the frame
  13. Cut the excess foam off using a razor blade at the stage of rendering the walls or installing plasterboard
  14. NOTE

    • Do not seal both sides at once, or foam will get all over the frame and you will use more foam than necessary
    • The foam seal should be neat
    • Do not trim off any excess foam until you are installing the render or the plasterboard
How do you install overhead cupboards?
Prior to plasterboarding the walls you simply mark out the cupboard location and remove 100mm wide strip of foam back to the concrete core. Mount the timber e.g. Glue with No More Nails, Max Bond or ZEGO Adhesive spray foam or bolt or use nail gun. Then install plasterboard and mount cupboard using wood screws as normal. Mounting items after plasterboard. Use plastic conduit or gal waterpipe as a spacer. Drill hole in plasterboard and foam back to concrete face. Place conduit or water pipe in hole. Drill masonary anchor in the centre and mount your item e.g. Clothes dryer or kitchen cupboards. When you tighten the bolts they will compress on the spacer conduit or water pipe and not compress or affect the plasterboard. Spacer length = plasterboard + foam thickness back to the concrete face.
Top Plate?
Top Plate / Pitching Plate Setup

Use 10mm galvanised cuphead bolts (length = top plate thickness + 15mm + length down to below top bond beam steel)

Insert it through an off cut of foam 45mm = Top plate thickness

This foam sits on top of the ZEGO wall and stops the bolt from sinking into the wet concrete. It also keeps it centred and protects the thread


SimpleFAQ V2.50

Share |


partners
energyhla
cpdspasa
masterbuilders
zeego

Follow Us:
zeego
zeego

bottom_content_left bottom_content_right
  bottom_phone Home | About us | Projects | Products | Careers | Contact us | Legal & Policy | Sitemap
Copyright © 2001-2009 www.zego.com.au ABN: 43 095 885 868
bottom_right