Top Plate / Pitching Plate Setup
Use 10mm galvanised cuphead bolts (length = top plate thickness + 15mm + length down to below top bond beam steel)
Insert it through an off cut of foam 45mm = Top plate thickness
This foam sits on top of the ZEGO wall and stops the bolt from sinking into the wet concrete and also keeps it centred and protects the thread
The next day, simply place the top plate over the bolts and hit with a hammer, then drill the timber where the marks are and bolt the top plate down. If you have levelled the concrete smoothly, tighten the bolts. If required, you can pack or shim the top plate level by using a string line

