Concrete Footings
Concrete footings stepped and level
When building off strip footings, any steps are recommeded/preferred to be in levels of 300mm ie 300-600-900-1200 etc
If you are using ZEGO Wall props, allow a 200mm clearance area to one side of the wall, so the wall props can be bolted down
